Japan
Kurobe Gorge Railway
Unazuki → Keyakidaira

Seat view guide
Best Side to Sit
Unazuki → Keyakidaira
Overall recommendation
Varies
The line curves repeatedly, so no single side is supported for the full journey.
It changes along the way
- Lake Unazuki1–5 km · Limited dataRight
- Atobiki Bridge5–8 km · Limited dataBoth sides
- Kurobe River gorge8–14 km · Limited dataVaries
- Kanetsuri riverside14–16 km · Limited dataRight
- Keyakidaira gorge16–20 km · Limited dataVaries
Some sections are early guidance based on limited reports.
Explore the route
Interactive Route Map
Pan and zoom to explore
From Unazuki to Keyakidaira, via Kuronagi, Kanetsuri.
Scenic journey timeline
Along the Journey
A calm guide to the moments worth looking up for, arranged from Unazuki to Keyakidaira.
- Departure · 0 km · 0 minUnazuki
- Arrival · 20 km · 1 hr 20 minKeyakidaira
Look out for
Journey Highlights
Places & Rallii Lore
Read the railway landscape
Atobiki Bridge
A 64-metre bridge crosses the deepest, steepest side valley on the line, 60 metres above the floor.
The narrow-gauge railway crosses a steep side valley on one of its most exposed bridge sections.Kurobe River gorge
The middle railway alternates tunnels with brief openings onto the river and densely forested walls.
The railway was developed alongside hydroelectric works and remains closely confined by the Kurobe River gorge.historyA railway born from power developmentThe Kurobe Gorge Railway grew from infrastructure built to support hydroelectric construction.

Its narrow alignment follows a landscape of dams, bridges, tunnels, and steep river walls. The passenger journey still reveals the railway’s industrial origins as it moves deeper into the gorge.
Source: Kurobe Gorge RailwayEditorial confidence · Checked 2026-08-17Journey overview
What to Expect
- Reservations
- Recommended for this journey.
- Train
- Open-sided narrow-gauge trolley train
- Operated by
- Kurobe Gorge Railway Co., Ltd.
Plan the journey
Practical Information
- 2026 operating section
- Dated 12 August 2026: the operator lists Unazuki–Nekomata shuttle service through 30 September and says full Unazuki–Keyakidaira service resumes 1 October. Check the current operating section before travel.Check current operator information
- Seasonal railway
- This mountain railway operates seasonally and weather or recovery work can affect access. The canonical journey describes the enduring full line, not guaranteed service on every date.Check current operator information
- Reservations
- All trains have controlled capacity. The operator suggests reservations at all times and strongly recommends them during peak holiday and autumn-colour periods; seating within the assigned open car is first come, first served.Check current operator information
- Open carriage
- Standard cars use open sides and four-person bench seating. Bring layers and rain protection: mountain weather changes quickly, and there are no toilets on the train.
- Accessibility
- The operator lists elevators, ramps, and accessible toilets at Unazuki and Keyakidaira and invites passengers to request staff assistance. Confirm boarding support and the current accessible operating section in advance.Check current operator information
- At Keyakidaira
- Earthquake-recovery work currently restricts access around the station. The operator says the station rooftop and visitor center remain available; check current walking-area access before relying on onward sights.Check current operator information
Continue the story
Related journeys

Norway
Flåm Railway
Flåm → Myrdal
Another compact mountain railway shaped by steep terrain
Fjords · Waterfalls · Mountain Valleys

New Zealand
TranzAlpine
Christchurch → Greymouth
Another journey where river and mountain landscapes define the route
Mountain Valleys · Gorges · Lakes
Route & data sources
- Operator informationKurobe Gorge Railway — Route Guide
Official station sequence, 2026 operating sections, landmarks, and Keyakidaira access context.
- Operator informationKurobe Gorge Railway — Information
Official reservation, comfort, onboard toilet, weather, and accessibility guidance.
- Operator informationKurobe Gorge Railway — Timetable
Official representative duration, capacity-controlled seating, and open-carriage character; no fare or permanent timetable is reproduced.
- Scenic contextJapan National Tourism Organization
Official tourism context for the 20-kilometre gorge railway, bridges, tunnels, and seasonal landscape.
- Railway / map dataOpenStreetMap
Prepared from 99 connected narrow-gauge main-line ways between Unazuki and Keyakidaira; © OpenStreetMap contributors, ODbL.
- Rallii guidanceRallii guidance
Curated timeline and cautious, entirely limited-data viewing guidance derived from official landmark context and prepared geometry.